Java project #4 was mailed off to my tutor. Despite going over it with a fine tooth comb, I'm sure I've neglected some nuance or detail and will lose a mark, but I had to get it DONE and it is, and it compiles and runs and that's all you need for a pass, and it actually outputs the specified output, so that's a decent pass.
So, accomplishment #2, is actually from a week or so back:

The neverending Grasshopper knee socks. Check the Gallery for detailed pics.
And:
Stormwater. Crumply and bumpy, I bound off yesterday, and tried the magic incantation that is blocking for the first time. Well, actually the first two times as I pinned one zig-zaggy edge backwards, it was zag-ziggy instead, and didn't notice until it dried.
So, now for no good reason I can think of, I have a beautiful Seasilk lace shawl. I shall wear it with jeans and my neon-sherbet-coloured Solstice Slip socks when I meet the Queen, of course.
And since accomplishments never mean there's nothing left to do - off to Assignment #5, the Solstice Slip socks, a pair of Widdershins basics for Adam, and a scarf I am now inventing as I go out of the remaining Wild Tide yarn (same stuff as in the Grasshoppers).

1 comment:
So pretty, both socks and shawl!
How is Maui doing?
Post a Comment